Rafflesia condo construction side take on 18 April 2014.
Look like the construction work done on the flooring.
Here is a blog for my first condo at Sentul. This blog is share some of the information about this condo or my unit.
Rafflesia condo construction side take on 18 April 2014.
Look like the construction work done on the flooring.
It quite difficult to get housing loan now a day. The bank didnt give you full loan now.
Sign the S&P for the two unit of the Rafflesia condo.
Hope that everything go smoothly. 7 July 2013.
今天签下了公寓的买卖合同了。是值得纪念的一天。
Today i visit refflesia condo side to check construction work for this
condo. Kl is very hazing due to the burning smoke from Indonesia.
The piling for rafflesia condo already started.
Here is some photo to show piling progress.